Projetos

Jakarta Aggregate Terminal Loading Operation, Indonesia

Daily loading and short-haul transfer of 6,000 tonnes of aggregate in a high-dust yard, lifting truck-turn efficiency by 22%.

Wheel loader loading crushed gravel into a dump truck at a port aggregate terminal in blue hour
Localização
Jakarta Bay Area
Tipo de projeto
Aggregate & Mining
Entregue
10 Mar 2022
The aggregate terminal on Jakarta Bay handles seaborne aggregate distribution under heavy dust and fast cycles. Wheel loaders take the lead in stockpile feeding and truck loading, supported by crawler excavators for pile shaping and yard leveling. Heavy-duty filtration and dust-sealing packages were specified for the hot and humid climate. In the first quarter the terminal hit its 6,000 t/day target, with per-machine loading output up roughly 22% over the previous fleet.

Precisa de uma configuração ou de um orçamento?

Envie-nos as condições de trabalho e retornaremos com a máquina adequada.

WhatsAppE-mail