Mga Proyekto

Manila–Cavite Expressway Expansion, Philippines

Confined excavation and subgrade compaction on coastal soft soil. NT-series machines worked 11 months straight and moved 380,000 m³ of earth.

Crawler excavators and a vibratory roller working in formation on a coastal expressway expansion at golden dusk
Lokasyon
Cavite, Luzon Island
Uri ng proyekto
Highway & Roadwork
Naihatid
15 Nov 2019
The expansion section of the Manila–Cavite Expressway crosses a dense urban corridor with narrow work zones and typical coastal soft soil. Multiple NT-series crawler excavators handled trench excavation, slope trimming and site clearing, while vibratory rollers delivered layer-by-layer subgrade compaction. Machine availability stayed above 95% throughout the project, with fuel and maintenance costs running below comparable European and American brands on site. The owner rated this section a schedule benchmark at interim acceptance.

Kailangan ng konfigurasyon o quote?

Ipadala ang mga kondisyon sa paggawa at kami ay sasagot ng spec ng makina.

WhatsAppEmail