Concrete Floor Works for Dubai Logistics Hub, UAE
46,000 m² of specification warehouse flooring: power-trowel teams for the slabs, plate compactors for edge backfill, flatness to FM2.

- Location
- Dubai South Logistics District
- Project type
- Industrial Flooring
- Delivered
- 20 Jan 2023
A specification warehouse in Dubai South demanded FM2 floor flatness and abrasion resistance. Ride-on power trowel teams worked with laser screeding in zoning flows, while plate compactors delivered layered compaction in trench and foundation backfill zones around the slab. The 46,000 m² floor was handed over two weeks early with a 98.6% flatness pass rate, and the same contractor added more machines for phase two.